Nolet Distillery 325th Birthday Celebration

Nolet Distillery

Client : TBA PLC

 

THE BRIEF

To design the set and staging for the Nolet Distillery's 325th Anniversary celebrations in Schiedam, Holland.

THE SOLUTION

XKX developed designs and produced CAD drawings for the event. From these we manufactured intricate fret panels for the entrance and internal dividing walls.

We also provided all of the set structuring including the steal arched stage which was laced with over 100 metres of black chain. DJ booths, cut copper signage, carpeting, decking, fabric pleated walls and planters.

We transformed the distillery bar by covering it in copper and slate laminate and copper cut signage.

SERVICES PROVIDED

- Set Design & Engineering
- Manufacturing & Install